Santa Clara, CA, August 24, 2022 – (SEAPRWire) – Recently, a brand-new platform project utilizing NFT content has been launched by Line Global Partner’s, a business that specializes in platform business. Line Global Partner’s created cutting-edge digital app platforms and the business demonstrated its proficiency as an app platform provider. Line Global Partner’s has announced that it will diversify into the blockchain industry in addition to its current digital app platform company and NTP (NFT Track Protocol) project, which can track, manage, and protect stored NFT content through the minting process, are going to be introduced by Line Global Partner’s. The NTP project offers high security services for the storage and transportation of NFT content through NFT contract and data collection system, mutual verification route track system, digital content movement path management and execution control system. Additionally, the NFT Marketplace (NTP-ZONE), which is guarded by the robust security mechanism offered by the NTP project, allows users to experience NFT culture more securely. For NFT creative actions within NTP-ZONE, the NTP project pays out in NTP tokens. By encouraging NFT creators to participate in NFT creative activities, the remuneration would revive NFT creation on the platform. Every NFT content piece produced in the NTP-ZONE is subject to the NFT Track Protocol, and the creator’s work can be secured utilizing the NFT content tracking/protection system by means of the NFT Track Protocol. Through the NTP project, Line Global Partner’s is anticipated to successfully grow its business into the blockchain sector and positively impact the NFT market Social Links Twitter: https://twitter.com/NTP_Place Medium: https://medium.com/@social_32364 Media Contact Company: LINE GLOBAL PARTNER’S LLC Contact: dh.kim Email: contact@ntp-place.io Website: https://ntp-place.io/ Address: 3964 RIVERMARK PLACE SANTA CLARA California USA SOURCE: LINE GLOBAL PARTNER’S LLC The article is provided by a third-party content provider. SEAPRWire ( https://www.seaprwire.com/ ) makes no warranties or representations in connection therewith. Any questions, please contact cs/at/SEAPRWire.com Sectors: Top Story, Daily News SEA PRWire: PR distribution in Southeast Asia (Hong Kong: AsiaExcite, EastMud; AsiaEase; Singapore: SEAChronicle, VOASG; NetDace; Thailand: SEAsiabiz, AccessTH; Indonesia: SEATribune, DailyBerita; Philippines: SEATickers, PHNotes; Malaysia: SEANewswire, KULPR; Vietnam: SEANewsDesk, PostVN)
Despite the Bear Market, Iskra Added New Investors that Bought Into Its Pioneer NFT, Bringing Its Total Raised to Over $40 million Singapore, August 1, 2022 – (SEAPRWire) – ISKRA, one of the hottest Web3 game community and publishing platforms, announces that it secured an additional investment from ROK Capital, Joycity, 111%, LINE Studio, Redice, and KOSPI-listed Netmarble. This group of 6 new investors collectively invested in ISKRA by the purchase of the recently released node-operator class Pioneer NFT. This investment came hot on the heels of its recent investment led by some of Korea’s top technology companies bringing total seed capital raised-to-date to over $40 million USD. “This investment is the perfect definition of smart money. Each of the companies is one of the top players in its category. With Netmarble and LINE Studio, this investment will give ISKRA access to their outstanding game catalog. With a company like Redice, we can also look forward to showcase our platform’s ability to also work with other attractive content like webtoons,” said Eugene Lee, ISKRA CEO. ISKRA is trying to re-establish enjoyment as the main driver for gaming experiences in web3. Current P2E games have dominated with a grinding model where collecting loot boxes or day-trading has become the only goal. To that end, ISKRA ‘s platform is championing the concept of “play and earn” where virtual items tied to tokens and NFTs serve as tools that build the community experience as opposed to the ultimate objective. “Blockchain gaming is the next frontier for games and the ISKRA Web3 game community platform sits at that intersection. LINE Studio is excited to invest in ISKRA ‘s platform and share the vision of Play-And-Earn as being the next evolution of Play-to-Earn,” said Jeong Weon Lee, CEO of LINE Studio. “REDICE sees ISKRA as having the same potential we had prior to achieving the status. More importantly, we see that ISKRA platform and its potential audience as the perfect expansion of our core webtoon business.” < Jung Sook Jang, CEO of REDICE > About LINE Studio LINE studio developed many of LINE’s most popular games, including LINE Rangers, LINE Magic Coin, LINE Chef, LINE Bubble, and LINE Bubble 2. Working in all sorts of genres, we create games that top the charts and are loved in Japan, Taiwan, Thailand, and all around the world. About REDICE REDICE is a company of Comics, Webtoons and Animation production & distribution, well known worldwide for its global title, <Solo Leveling> and many other contents. Our goal is to create high quality contents for no specific target but to everyone to deliver happiness to more people on their daily lives. About Netmarble Corporation Established in Korea in 2000, Netmarble Corporation is a top developer and publisher pushing the boundaries of the mobile gaming experience with highly innovative games including Seven Knights 2, Ni no Kuni: Cross Worlds, MARVEL Future Revolution, Lineage 2: Revolution, The Seven Deadly Sins: Grand Cross, Blade & Soul Revolution and MARVEL Future Fight. As a parent company of Kabam and SpinX Games, and a major shareholder of Jam City and HYBE(formerly Big Hit Entertainment), Netmarble strives to entertain audiences around the world with a variety of mobile games based on its powerful franchises and collaborations with IP holders worldwide. More information can be found at http://company.netmarble.com About ISKRA ISKRA ( https://www.ISKRA.world ) is the Future of Play. The Company is backed by some of the biggest technology and game companies from Korea. ISKRA ‘s community-forward system aligns the interests of the community by rewarding its stakeholders based on their participation, while integrating sustainable tokenomic solutions for game developers that join its platform. The Company seeks to bridge the gap in web3 adoption between early adopters and the mainstream by combining enjoyment, sustainability and the latest in blockchain technology. Social Links Twitter: https://twitter.com/iskra_world Facebook: https://www.facebook.com/iskraworldofficial Discord: https://discord.com/invite/iskraworld Medium: https://medium.com/@iskra.world LinkedIn: https://www.linkedin.com/company/iskra-world/ YouTube: https://www.youtube.com/IskraWorld Telegram: https://t.me/iskra_world_official Media Contact Brand: ISKRA Contact: Ben Colayco, Global Managing Director Email: media@ISKRA.world Address: ISKRA Pte. Ltd., 24 Raffles Place, #17-04 Clifford Centre, Singapore 048621 Website: https://www.iskra.world SOURCE: ISKRA The article is provided by a third-party content provider. SEAPRWire ( https://www.seaprwire.com/ ) makes no warranties or representations in connection therewith. Any questions, please contact cs/at/SEAPRWire.com Sectors: Top Story, Daily News SEA PRWire: PR distribution in Southeast Asia (Hong Kong: AsiaExcite, EastMud; AsiaEase; Singapore: SEAChronicle, VOASG; NetDace; Thailand: SEAsiabiz, AccessTH; Indonesia: SEATribune, DailyBerita; Philippines: SEATickers, PHNotes; Malaysia: SEANewswire, KULPR; Vietnam: SEANewsDesk, PostVN)
TOKYO, Apr 14, 2022 - (JCN Newswire via SEAPRWire.com) - Mitsubishi Heavy Industries, Ltd. (MHI) has received an order from the Infrastructure Development Office (GDI) of the Macau Special Administrative Region in China for extensions of the Macau Light Rapid Transit(1) (MLRT) network using an Automated Guideway Transit(2) (AGT) system. The project will extend the MLRT Taipa Line opened in December 2019. MHI will make use of the accumulated knowledge of MHI Group, focusing its efforts on strengthening the system for safe and smooth transport in the Macau metropolitan area.Macau LRT (Taipa Line)This project comprises three new extensions from the Taipa Line (11 stations, 9.3km) currently operating on the Taipa island area of Macau, a district lined with new resort hotels. The Barra Extension (1 station expansion, 3.4km) will link the line to the Macau Peninsula opposite the island, the Seac Pai Van Extension (2 stations plus transfer station expansion, 1.3km) will provide access to Seac Pai Van, an area projected to grow in population and the planned site for construction of a large hospital, and the Hengqin Extension (2 station expansions, 2.2km) will run to Hengqin in China. The Seac Pai Van and Hengqin extensions will be executed under a three-company consortium with local general contractors Top Builders Macau Co. Ltd. and Hou Chun Construction and Engineering Company Limited. The project will contribute to further advancement of the regional economy and human resources development.MHI will handle the entire system including the signals, communication systems, power supply facilities, track construction, platform doors, and fare charge machines (excluding construction of station buildings, civil engineering work, and rolling stock). The rolling stock planned for the lines are the AGT cars already delivered for the Taipa Line. For the project of the Taipa Line, MHI Group supplied 110 AGT cars, signal and train control equipment, power supply facilities, communication systems, tracks, maintenance facilities, platform doors, and fare charge machines. MHI also received an overhaul maintenance contract for the rolling stock for five years from the start of operations and will continue to support the stable operations of MLRT.Going forward, MHI will utilize its extensive track record providing AGT systems in Japan, Singapore, South Korea, UAE (Dubai), and other areas throughout the world, along with the strength of its high-quality O&M (operations and maintenance) services to compete for the lead in the market for new transport system in Japan and overseas. MHI will make use of knowledge it has accumulated through experience implementing AGT systems to alleviate congestion in the Macau metropolitan area and will continue supplying safe and low-carbon transport solutions that will help support economic development and provide better convenience to people in countries around the world.(1) The original abbreviation of LRT as "light rail transit" is widely used, but MLRT instead uses it to mean "light rapid transit" after the system's high-speed performance.(2) AGT systems are a new type of fully automated transport system with electric power drives, used in airports around the world to provide mobility between terminals and to nearby facilities. The system utilizes rubber tires to provide a smooth ride with low noise.About MHI GroupMitsubishi Heavy Industries (MHI) Group is one of the world's leading industrial groups, spanning energy, logistics & infrastructure, industrial machinery, aerospace and defense. MHI Group combines cutting-edge technology with deep experience to deliver innovative, integrated solutions that help to realize a carbon neutral world, improve the quality of life and ensure a safer world. For more information, please visit www.mhi.com or follow our insights and stories on spectra.mhi.com. Copyright 2022 JCN Newswire. All rights reserved. (via SEAPRWire)
TOKYO, Nov 9, 2021 - (JCN Newswire via SEAPRWire.com) - Mitsubishi Shipbuilding, a part of Mitsubishi Heavy Industries (MHI) Group, and Nippon Yusen Kabushiki Kaisha (NYK Line) have agreed to jointly develop a large-scale liquefied CO2 (LCO2) carrier. To facilitate the development of technologies for transporting CO2 using large vessels, this project will combine Mitsubishi Shipbuilding?s advanced gas handling technologies accumulated through the construction of liquified gas carriers (LPG and LNG carriers), with NYK Line?s wealth of knowledge in operations of not only small and medium-sized vessels, but also large vessels that are expected to increase in demand globally. The two companies will participate in the CCUS value chain based on the development of LCO2 carriers.Image of an LCO2 carrierCarbon dioxide capture, utilization, and storage (CCUS) is attracting attention worldwide as an effective means to achieve a carbon neutral world. LCO2 carriers will play a vital role in that value chain by transporting liquified CO2 to storage sites and facilities for utilization, and demand for these vessels is expected to increase in the future.Mitsubishi Shipbuilding is actively pursuing commercialization of LCO2 carriers as part of MHI Group?s strategic initiative for the energy transition, bringing together technologies and knowledge gained from construction of liquified gas carriers in an effort, as a marine systems integrator, to support decarbonization at sea. This joint project is expected to make a significant contribution to the establishment of a CO2 ecosystem(Note) in the CO2 transport sector, which will be an essential component of the CCUS value chain.NYK Line expects the establishment of technology to transport CO2 using large-scale LCO2 carriers to make a significant contribution to the realization of a carbon neutral world. Through this joint project with MHI Group, which possesses a wide range of technologies to overcome the high technological hurdles in the CCUS value chain, NYK Line will be integrating its accumulated wealth of knowledge in ship operations to support early realization of not only small and medium sized vessels, but also large-scale LCO2 carriers. Building on this project, NYK Line will participate in the CCUS value chain.Going forward, Mitsubishi Shipbuilding and NYK Line will continue their efforts through this joint development project to develop the technologies for LCO2 carriers necessary to establish a CCUS value chain, utilizing the complementary strengths and knowledge of the companies to contribute to the realization of a carbon neutral world.MHI Group defines "CO2 ecosystem" as a societal structure in which all stakeholders with a connection to CO2, both direct and indirect, come together beyond their respective interests to achieve coexistence and co-prosperity.About MHI GroupMitsubishi Heavy Industries (MHI) Group is one of the world's leading industrial groups, spanning energy, logistics & infrastructure, industrial machinery, aerospace and defense. MHI Group combines cutting-edge technology with deep experience to deliver innovative, integrated solutions that help to realize a carbon neutral world, improve the quality of life and ensure a safer world. For more information, please visit www.mhi.com or follow our insights and stories on www.spectra.mhi.com. Copyright 2021 JCN Newswire. All rights reserved. (via SEAPRWire)
JAKARTA, Nov 1, 2021 - (ACN Newswire via SEAPRWire.com) - Wintermar Offshore Marine (WINS:JK) has announced turnaround results for 9M2021 with a net profit of US$0.49 million following a loss of US$7.44 mil in 9M2020.Stronger oil prices and measures to streamline the fleet and reduce gearing helped in turning the Company around after several years of heavy losses. In line with the positive outlook for oil prices, utilization also improved to 66% in 9M2021 compared to 63% in 9M2020.Owned Vessel DivisionOwned Vessel Revenue for 9M2021 was reduced by US$0.2 million to US$24.4 million compared to 9M2020. During July and August, the delta variant of COVID-19 hit Indonesia hard and affected our operations in Asia. A few of our vessels were infected while crew change was delayed due to quarantine and travel restrictions, leading to unplanned downtime. This and the completion of some high end vessel contracts led to a lower margin for 3Q2021. However, since September the pandemic has waned significantly in Indonesia and business operations have recovered back to normal.Despite the disruption from COVID-19, due to a much lower cost base and a smaller fleet, the Company made a US$4.1 mil gross profit this year for 9M2021 compared to a loss of US$2 million in 9M2020 on nearly the same revenue. Fuel costs rose to 37% as some high tier vessels were idle between contracts.Chartering and Other ServicesContribution from the Chartering Division in 9M2021 jumped by 64% YoY from US$0.4 million to US$0.66 mil while contribution from other services also jumped 85% YOY to US$0.62 million in 9M2021 from US$0.34 million in 9M2020. These reflect the underlying improvements in offshore vessel demand.Indirect Expenses and Operating ProfitIndirect expenses totaled US$3.92 million in 9M2021, falling 13% YOY from US$4.5 million, reflecting a much leaner organizational structure with lower overheads as compared to 2020. This has resulted from the fleet efficiency exercise over the past couple of years to sell less efficient vessels and reduce overheads. 9M2021 operating profit amounted to US$0.15 million.Other Income, Expenses and Net Attributable profitSince January 2021, the Company has sold 3 vessels and has already entered into a MOA to sell another three, registering in a US$2.4 million gain on sale of vessels. The total fleet now stands at 40 vessels. A total of US$9.5 million in vessel loans was repaid, bringing the Company's net gearing down to 21.7% by end September 2021. Interest expenses for 9M2021 fell by 33% YOY to U$1.66 million in line with lower debt. Associated Companies generated income of US$0.24 million due to better operational results, bringing the other income to US$0.79 million for 9M2021 compared to a loss in 9M2020.The stronger operational environment has boosted the bottom line, with net income attributable to shareholders of US$0.49 million for 9M2021, as compared to a US$7.44 million loss.EBITDA for 9M2021 also rose by 13% YOY to US$10.2 million.Oil & Gas IndustryAs expected, the opening up of travel restrictions across the world has led to a spike in oil prices as supply has not been able to keep pace with growing demand for oil and gas. Global oil demand is expected to recover to pre-virus levels in 2H2022 and the 3rd quarter saw Brent crude oil prices breaking above US$85/barrel, levels not seen since 2014. This reflects the optimism in the oil and gas industry which has finally shown a cyclical recovery. In Indonesia, there are tenders for drilling projects due to start in early 2022.Offshore VesselsIn line with the oil price spike, there has been an increase in purchases of second hand offshore vessels, and prices have turned around as vessels which had been on offer for a while were bought up. The international rig count has also picked up as more investments have commenced. This is in line with our optimistic outlook for the industry in 2022.Strategy and OutlookOver the past few months, the Company has stepped up the sale of older and less productive vessels to take advantage of the improvement in second hand OSV prices. The fleet now stands at 40 vessels, and more are planned to be sold in 4Q2021. This strategy to reduce bank debt as well as keep some cash on hand has created a stronger balance sheet. As banks are still reluctant to lend for vessel acquisition, the Company now has the flexibility to acquire assets as and when the opportunity arises without having to wait for bank loan approval.Contracts on hand as at end September 2021 totalled US$64 million.About Wintermar Offshore Marine GroupWintermar Offshore Marine Group (WINS.JK), developed over nearly 50 years with a track record of quality that is both a source of pride and responsibility that we are dedicated to upholding, and sails a fleet of more than 48 Offshore Support Vessels ready for long term as well as spot charters. All vessels are operated by experienced Indonesian crew, tracked by satellite systems and monitored in real-time by shore-based Vessel Teams.Wintermar is the first shipping company in Indonesia to be certified with an Integrated Management System by Lloyd's Register Quality Assurance, and is currently certified with ISO 9001:2015 (Quality), ISO14001:2015 (Environment) and OHSAS 18001:2007 (Occupational Health and Safety). For more information, please visit www.wintermar.com.Ms. Pek Swan Layanto, CFA Investor RelationsPT Wintermar Offshore Marine TbkTel +62-21 530 5201 Ext 401Email: investor_relations@wintermar.com Copyright 2021 ACN Newswire. All rights reserved. (via SEAPRWire)
SINGAPORE - At 5.15am on Saturday (Aug 28), minutes before the Thomson-East Coast Line gantry at Caldecott MRT station officially opened to the public, a middle-aged man in a blue shirt and shorts walked to station personnel and said: "I want to take the first train." It was also a nostalgic trip for the school teacher, Mr Yap Siew Meng, 49, because in the 1980s, he was among the first to ride an MRT train when services for the mass rapid transit started and stations opened. On Saturday, Mr Yap joined at least three other passengers who were the first to be travel along the newly opened extended stretch of the Thomson-East Coast Line, spanning six stations from Caldecott to Springleaf. The first train at Caldecott MRT station departed at 5.50am, at the crack of dawn. At around 7am, trains were starting to fill up slowly, with about four passengers scattered around each car. The highly anticipated six-station stretch, named TEL2, connects the new Springleaf, Lentor, Mayflower, Bright Hill, Upper Thomson and Caldecott stations. The line's first three stations - Woodlands North, Woodlands and Woodlands South, collectively called TEL1 - opened in January last year. Mr Yap, who lives in Bedok, woke up at 4.45am and took a cab to Caldecott station to catch the first train. He works in a school in Bishan and said he is likely to take the Thomson-East Coast Line more frequently in the coming years when the line extends to the east. "I saw many reports on (TEL2). It is brand new and I was excited. I wanted to be the first in Singapore to take the train." The Saturday MRT ride from the newly opened station was also a symbolic one for the teacher. In 1987, Mr Yap - then 15 years old - was one of the first to board an MRT train when operations began with just five stations on the North-South Line, from Toa Payoh to Yio Chu Kang. "I still have the train ticket from 1987, a golden-coloured ticket," he said. Mr Yap also has a hobby of making YouTube videos of bus, train and cable car rides, including trips to attractions such as Marina Bay Sands. He plans to upload his video of the first TEL2 train later in the day. Mr Yap Siew Meng, who lives in Bedok, woke up at 4.45am and took a cab to Caldecott MRT station to catch the first train. ST PHOTO: ALPHONSUS CHERN More on this topic Related Story Thomson-East Coast Line stage two opens on Aug 28 When fully completed around 2025, the 43km Thomson-East Coast Line will run from Woodlands North to Sungei Budok in the east, covering 32 stations. Saturday was the second stage of the line's opening, with nine stations in operation. The rest of the stations will progressively open in three more stages over the next few years. For Madam Lim Guek Lin, who lives near Caldecott, the extended train line will save a lot of travel time as she can now take a single train line up to Woodlands, where she works in an electronics factory. The 63-year-old was also one of the passengers on the first train on Saturday. Previously, to get to work, she had to take a bus to Braddell MRT station on the North-South Line and ride up to Sembawang station, before taking a bus to her workplace. With the TEL2, not only is her travel route more straightforward, Madam Lim can also get to work earlier. On her old route, the first North-South Line train only reaches Braddell later at 6.05am. "It's very late for me because by the time the bus I take arrives, it is often very packed and I can't board it. With the new line, it's much more convenient for me," said Madam Lim in Mandarin. A train enthusiast taking photographs along the Caldecott to Springleaf section of the Thomson-East Coast Line on Aug 28, 2021. ST PHOTO: ALPHONSUS CHERN TEL2 will have two interchanges - Caldecott station on the Circle Line; and Bright Hill on the future Cross Island Line. Trains along the Thomson-East Coast Line will arrive at stations every five minutes during peak hours and every nine minutes off-peak. The first train on Saturday took about 30 minutes to reach Woodlands North station from Caldecott. TEL2 was initially set to roll out in the second half of last year, but was delayed due to the pandemic and a review of the rail system software because of a major signalling fault on TEL1 last December. The current stretch from Woodlands North to Caldecott will benefit about 100,000 households. Once completed, the entire 32-station line will cost more than $25 billion, and it will also link to the upcoming cross-border rapid transit line to Johor Baru. Other early birds on the first train at TEL2 on Saturday morning were two father-son pairs. Two of the first commuters on board the 5:50am TEL train out of Caldecott station on Aug 28, 2021. ST PHOTO: ALPHONSUS CHERN Eleven-year-old Eamon Kwong and his father, Mr Adrian Kwong, boarded the first train at Upper Thomson station. Eamon said: "I wanted to see the train all new and clean. It's like a once-in-a-lifetime moment." Watching his son excitedly bound to the front of the train and seeing it zip through the tunnel felt like a blast from the past for Mr Kwong, 47. It brought back memories of his first MRT ride in 1987, when the first 6km stretch of the North-South Line was opened. "I remember when I was a kid, in 1987, taking the very first MRT segment. I remembered how exciting it was, so I thought I would just let him come and see (TEL2), and remember this moment." As for the second father-son duo, train lover Shion Adachi, 14, asked his father, Mr Kazuhiko Adachi, to drive him to Caldecott station from their home in Clementi. "My son likes fast trains. He remembers his first train ride in Japan when he was three or four. His passion for trains has stuck with him ever since," said Mr Adachi, 49, who works in finance. The stations on the new stretch were designed to be pleasing to the eye, while keeping commuters' comfort in mind. ST PHOTO: ALPHONSUS CHERN Hailing from Japan, Shion and Mr Adachi have been living in Singapore for the past six years. Throughout the ride along the Thomson-East Coast Line, Shion and other commuters were busy taking videos of the ride and the train's interior. The stations on the new stretch were also designed to be pleasing to the eye, while keeping commuters' comfort in mind. Some benches at the six stations come with armrests and backrests. The signs at the stations also have larger fonts and simple icons so that they are easier to read. The exits are also indicated by numbers instead of letters. For the Thomson-East Coast Line trains, each train car has five doors, compared with four on other trains. This allows passengers to alight faster, and to avoid pushing through people when the train is crowded. For the Thomson-East Coast Line trains, each train car has five doors, compared with four on other trains. ST PHOTO: ALPHONSUS CHERN More on this topic Related Story Unique designs, seats with backrest among features at new Thomson-East Coast Line stations Related Story Treading a fine line in building Thomson-East Coast Line stations Various pieces of art - including drawings and artwork along the walls and station platforms, and art installations - have been installed at the six stations. While waiting for their train in Upper Thomson station, commuters can entertain themselves by looking for 88 drawings of animals hidden all over the station. At Mayflower station, passengers can snap pictures of tiny bird sculptures perched on different parts of the station. With numerous green spaces and nature trails such as MacRitchie Reservoir and Springleaf Nature Park located nearby, the TEL2 stations will make travelling more convenient for fitness enthusiasts and nature lovers. At the line's opening ceremony on Friday, Senior Minister Teo Chee Hean said TEL2 may well become a "makan corridor", referencing the eateries near the stations. For example, Springleaf Prata Place - a stone's throw away from Springleaf MRT station - is a household name for roti prata, briyani, thosai and murtabak. Mr Kwong said: "A lot of people may get off at Upper Thomson station today because of the various ways it has been advertised - dining options and nature." More on this topic Related Story Good eats near 6 new MRT stations on Thomson-East Coast Line 2 Related Story 9 calorie-burning walks around Thomson-East Coast Line 2
Thomson-East Coast Line stage two opens on Aug 28, trains to arrive every five minutes at peak hours
SINGAPORE - Trains along the Thomson-East Coast Line (TEL) will arrive at stations every five minutes during peak hours and every nine minutes off-peak, when the second stage of the line opens on Saturday (Aug 28). This is up from the current frequency of 10 minutes during peak hours and 15 minutes during off-peak hours at the first three stations of TEL in Woodlands. The Land Transport Authority (LTA) said it will review the frequencies as ridership increases along TEL. Trains generally arrive at intervals of two to three minutes during peak hours from 7am to 9am on other MRT lines, and about five to seven minutes off-peak. The new six-station stretch, named TEL2, connects Springleaf, Lentor, Mayflower, Bright Hill, Upper Thomson and Caldecott stations. Three other stations - Woodlands North, Woodlands and Woodlands South - opened in January last year. TEL2 will have two interchanges - Caldecott, with the Circle Line; and Bright Hill, with the future Cross Island Line. An opening ceremony was held for TEL2 on Friday morning (Aug 27). Transport Minister S. Iswaran acknowledged the inconvenience to residents and shop owners around the area during construction, and thanked them for their patience. He added: "TEL2 adds to the reliability and resilience of our overall public transport system. I hope all Singaporeans will benefit and enjoy the convenience that our public transport brings to them." Senior Minister and Coordinating Minister for National Security Teo Chee Hean, the event's guest-of-honour, said TEL2 may well become a "makan corridor"- referencing the eateries near the stations. (From left) LTA chief Ng Lang, Transport Minister S. Iswaran, Senior Minister Teo Chee Hean, LTA chairman Alan Chan and SMRT chairman Seah Moon Ming at the opening ceremony on Aug 27, 2021. PHOTO: LIANHE ZAOBAO Transport Minister S. Iswaran (left) and Senior Minister Teo Chee Hean snapping photos of the TEL2 tunnel on Aug 27, 2021. PHOTO: LIANHE ZAOBAO More on this topic Related Story Unique designs, seats with backrest among features at new Thomson-East Coast Line stations TEL2 was initially set to roll out in the second half of last year, but was delayed due to the pandemic and a review of the rail system software because of a major signalling fault on TEL1 last December. Transport Minister S. Iswaran has said TEL1 and TEL2 alone will benefit about 100,000 households. When fully completed in around 2025, the 43km, 32-station TEL is expected to have an average daily ridership of 500,000 initially, rising to one million in the longer term. The line, which will run from Woodlands to Sungei Bedok and cost more than $25 billion, will also link to the upcoming cross-border rapid transit line to Johor Baru. More on this topic Related Story Good eats near 6 new MRT stations on Thomson-East Coast Line 2 Related Story 9 calorie-burning walks around Thomson-East Coast Line 2
SINGAPORE - The long-awaited second stage of the Thomson-East Coast MRT Line will start running on Aug 28. Transport Minister S. Iswaran on Wednesday (June 30) said the new six-station stretch - connecting Springleaf, Lentor, Mayflower, Bright Hill, Upper Thomson and Caldecott stations - "would not have been possible without the hard work, adaptability and personal sacrifices of our technicians, engineers and ground staff". Delayed in part by the Covid-19 pandemic, TEL2 will have two interchanges - Caldecott with the Circle Line and Bright Hill with the future Cross Island Line. Mr Iswaran said the TEL will enhance the resilience of the rail network. When fully opened in the latter half of the decade, the TEL will interchange with five existing MRT lines (North-south, East-west, North-east, Circle and Downtown) as well as the Cross Island Line. When TEL is fully completed, more than 240,000 current and future households will be within a 10-minute walk from a station along the line, he added. Walkthrough of Caldecott Station (Thomson-East Coast Line) TEL1 and TEL2 alone will benefit about 100,000 households, he said. The first stage of the TEL - a three-station stretch from Woodlands North to Woodlands South - opened in January 2020. Speaking at Caldecott station, Mr Iswaran pointed out that the station is located near the Singapore Association of the Visually Handicapped and Lighthouse School. "To better support visually impaired commuters, TEL's lift buttons, platform seats and signages will have greater colour contrasts," he said. The 43km, 32-station TEL is expected to have an average ridership of 500,000 initially, rising to one million in the longer term. PHOTO: LIANHE ZAOBAO When TEL is fully completed, more than 240,000 current and future households will be within a 10-minute walk from a station along the line. PHOTO: LIANHE ZAOBAO Lighting will also be installed into the handrails of staircases, to enhance the visibility of the steps, he added. For seniors and commuters with mobility difficulties, there will be backrests and handrails on seats at the station platform. The 43km, 32-station TEL is expected to have an average ridership of 500,000 initially, rising to one million in the longer term. The line, which will run from Woodlands to Bedok, will also connect to the upcoming cross-border rapid transit line to Johor Baru. More on this topic Related Story TEL's Mayflower station to have bird sculptures, Springleaf station gets tree of memories
SHENZHEN, CHINA, Apr 11, 2021 - (ACN Newswire via SEAPRWire.com) - On April 8th, BYD ushered in a new milestone, as its Bahia SkyRail vehicle rolled off the production line in Shenzhen. The Bahia SkyRail, located in the city of Salvador, Bahia State, Brazil, is the world's first SkyRail line to be partially built above the sea.BYD's Full Market Electric Vehicle SolutionsThe ceremony was held at BYD's global headquarters in Shenzhen. Rui Costa, Governor of Bahia; Joao Leao, Vice Governor of Bahia; and Mrs. Shao Yingjun, Minister for Commercial Affairs of the Chinese Embassy, witnessed the ceremony online.Satisfied with the performance of the new model, Governor Rui Costa insisted that the VLT do Suburbio symbolizes an important international partnership for the modernization of urban transport. "After placing Bahia as the second metro extension in Brazil, we now take a large step towards modernization with this modern vehicle that will replace a train that no longer met operating conditions," commented Rui Costa.Joao Leao, Vice Governor of Bahia, also highly recognized BYD's integral role in the project, expressing sincere gratitude to BYD.Stella Li, Executive Vice President of BYD Company Limited & President of BYD Motors Inc., said, "Today's vehicles are specially tailored to the unique geographical and cultural environment of Salvador, the smooth and comfortable ride, humanized and intelligent design will bring passengers a more pleasant and convenient green travel experience. Brazil has embraced BYD's green, zero-emission transport offerings across the board, including pure electric buses, trucks, taxis and the SkyRail, making the country the leading model for eco-friendly transport in Latin America. In the future, BYD will continue to work hard with its leading new energy technology and high-quality rail transit offerings to help cities around the world build low-carbon transportation and achieve sustainable development!"The Bahia SkyRail has been specially customized to meet local regulations and needs, as the world's first SkyRail line built for an overseas market. The vehicle adopts a streamlined design, which reduces wind resistance while enhancing the overall aesthetics. Meanwhile, large, barrier-free doors enable passengers of all kinds to easily enter and exit, regardless of whether they are walking, in a wheelchair or pushing a baby stroller. The vehicles feature a walk-through train design to provide excellent accessibility, and the large windows on both sides offer expansive views for an enjoyable transit experience, while the air suspension system ensures that the vehicle runs quietly and smoothly.Additionally, SkyRail is equipped with a fully automatic operation system with cutting-edge train control technology and an intelligent customer service system, which realizes a high degree of train automation. It enables more precise operations control, resulting in higher reliability, safety, operational efficiency, and punctuality. Meanwhile, on-board PIS, CCTV, emergency intercom, and other systems serve passengers in real-time, ensuring a safe and convenient riding experience. The vehicles can also be flexibly grouped according to actual capacity needs.The Bahia SkyRail Line has 25 stations covering a total length of 23.3km. It will be connected with Bahia's existing subway to form a comprehensive public transportation network.Due to various factors such as local topography, community structure, demolition costs, and passenger volume, the Bahia SkyRail was customized to adhere to several extremely stringent technical standards, all of which it met.SkyRail is a straddle-type monorail system developed by a dedicated 1,000-strong R&D team following five years of research and development worth 5 billion RMB, which aims to solve traffic congestion in cities. With a minimum turning radius of only 45 meters and able to climb gradients of 10%, SkyRail is well adapted to Salvador's difficult terrain. What's more, advanced autonomous driving technology together with a striking and futuristic appearance allows the SkyRail to seamlessly fit into modern urban environments.SkyRail's unique technologies have overcome many of the difficulties of construction and operation in Bahia. For example, the elevated tracks don't occupy valuable road surface, meaning the space below them still can be rebuilt into pedestrianized areas, and their elevated position keeps them free from flooding, which has been a problem for the city's existing rail network. Thanks to the integrated line monitoring system and the intelligent operations system, SkyRail can immediately identify risks, solve problems, and reduce manual workloads. Besides offering comfortable, low-carbon and efficient public transport for residents, the expectation is that SkyRail will also help attract new businesses and visitors to the area, aiding the government's efforts to boost local tourism.The SkyRail has already created a noticeable buzz among local citizens. As early as February 13, 2019, on the day of signing the contract, a large number of citizens held up a banner at the gate of the government of Bahia, which read "very welcome VLT, thank you, governor", and yelled, "let's make it a reality together." Tyler Li, Country Manager of BYD Brazil, also said that when the SkyRail project team went to the local to inspect the progress of the project after half a year, the public recognized them at a glance and said hello cordially.On January 3, 2020, the state government approved the full preliminary design of the Bahia SkyRail. Bahia Governor Rui Costa said at the time, "SkyRail technology is very advanced, and China's rail technology has far surpassed that of other countries. I believe in Chinese technology."Representing China's strategic focus on fostering "new infrastructure", BYD's rail transit solutions are being warmly received as it strikes up new partnerships, bringing Chinese technology to the world. In Brazil, BYD has already forged cooperation with two cities, among them Sao Paulo, for which the formal contract to build the metro network's Line 17 was signed on April 27, 2020. BYD is also actively engaged in and negotiating other rail transit projects in more than 20 countries and cities spanning the Americas, Asia Pacific, Europe, and Africa, some of which are already under construction.About BYDBYD Company Ltd. is one of China's largest privately-owned enterprises. Since its inception in 1995, the company quickly developed solid expertise in rechargeable batteries and became a relentless advocate of sustainable development, successfully expanding its renewable energy solutions globally with operations in over 50 countries and regions. Its creation of a Zero Emissions Energy Ecosystem - comprising affordable solar power generation, reliable energy storage, and cutting-edge electrified transportation - has made it an industry leader in the energy and transportation sectors. BYD is listed on the Hong Kong and Shenzhen Stock Exchanges. More information on the company can be found at http://www.byd.com.Media Contact:> In Asia-Pacific: Mia Gumia.gu@byd.com; tel: +86-755-8988-8888-69666> In North America: Frank Girardotfrank.girardot@byd.com; tel: +1 213 245 6503> In Latin America: Mariana Osoriomariana.osorio@byd.com; tel: +56 9 8588 0333> In Brazil: Adalberto Malufadalberto.maluf@byd.com; tel: +19 3514 2554> In Europe: Penny Pengpenny.peng@byd.com; tel: +31-102070888 Copyright 2021 ACN Newswire. All rights reserved. (via SEAPRWire)
SINGAPORE - Hougang interchange station on the Cross Island Line and its tunnels will be built at a cost of $604 million by Samsung C&T Corporation. The Land Transport Authority (LTA) awarded the civil contract to the South Korean firm on Friday (March 26). Works should start in the fourth quarter of the year, the authority said. Hougang interchange station is under phase one of the Cross Island Line, which is set to begin operations in 2030. This stretch of the line runs from Aviation Park to Bright Hill, and all tenders have been called and are being progressively awarded. Samsung C&T Corporation's contract covers the design and construction of the station and tunnels, as well as alteration works to the existing Hougang station along the North East Line, which it also built. The company is now also building Caldecott and Marine Parade stations on the Thomson-East Coast Line and Xilin station on the Downtown Line. Its track record includes building Kovan station on the North East Line, as well as Expo and Upper Changi stations on the Downtown Line. The Cross Island Line is Singapore's eighth MRT line, and will link major hubs such as Jurong Lake District, Punggol Digital District and the Changi region. Almost half of its stations are interchanges with other rail lines. More on this topic Related Story LTA awards $356 million contract for Cross Island Line tunnel works Related Story Part of Cross Island MRT Line worksite to be moved into country club to protect endangered monkeys
PORTO, PORTUGAL (REUTERS) - FC Porto joined Manchester City in advancing to the next phase of the Champions League after the two played out a goalless draw in their Group C clash on Tuesday (Dec 1). The point, combined with defeat for Olympiakos in France, was enough to ensure Porto finished second while City, who had already qualified last week, are assured of top place. But Pep Guardiola's team surrendered their 100 per cent record in the group despite dominating their hosts as they set up a myriad of chances but proved unable to make the breakthrough. With one round left to play, City are on 13 points, three more than Porto - with both well clear of Olympiakos and Olympique Marseille, who have three points each. City pinned Porto back for most of the contest at the Estadio do Dragao and looked to have eventually broken through when substitute Gabriel Jesus found the net in the 80th minute, only for VAR to determine Joao Cancelo had been offside in the build-up. Raheem Sterling had two efforts cleared off the line - one by his own team mate - while Porto goalkeeper Agustin Marchesin made several sharp stops in an impressive display. Sterling got a goalward touch to the ball at the near post in the 69th minute and as it sped across the goal mouth, Ferran Torres stretched in to steer it over the line but bizarrely succeeded only in hooking it clear of the goal. In the first half, Sterling had cut in from the flank and blasted towards goal but the effort was cleared off the Porto line by Zaidu Sanussi. The City skipper's best opportunity, however, came just before the hour mark when Phil Foden's floated pass put the pacey England star away on goal, only to see him smothered by the on-rushing Marchesin in a fine stop. The ball rebounded off the goalkeeper and fell for the supporting Torres but the back spin caught him out and he was unable to tuck away the opportunity. City will finish their campaign at home to Marseille next week while Porto travel to Olympiakos in another dead rubber.
TOKYO, Nov 24, 2020 - (JCN Newswire) - Mitsubishi Corporation (MC) is pleased to announce that its consortium with Orascom Construction (Orascom) etc. has signed a contract with the Egyptian government to deliver the Railway Systems, Track and Depot Works Package (CP411) for Phase 1 of Cairo Metro Line 4. About the ProjectThe roughly 90 billion yen contract is with the National Authority for Tunnels (NAT), an agency that operates under the jurisdiction of the Arab Republic of Egypt's Ministry of Transport. Orascom is a Cairo-based engineering, procurement and construction contractor.Under the terms of the contract, MC will supply the equipment necessary to build the railway systems and be responsible for related administrative work. Orascom will handle the project?s civil engineering work and construction of the train operation control center and other facilities. Funded through an international yen loan provided by the Japan International Cooperation Agency (JICA), Phase 1 of Cairo Metro Line 4 project including CP411 will take advantage of advanced railway technologies developed in Japan. It will also be the first yen-loan project in Egypt under JICA's Special Terms for Economic Partnership (STEP) project.Phase 1 of Cairo Metro Line 4 will run from central Cairo to the Giza Pyramid Complex in the southwestern part of Greater Cairo. Ongoing urbanization in the Egyptian capital has resulted in its rapid population and traffic growth, and the development of public transportation infrastructure has become a matter of urgency for city officials. Not only is Line 4 expected to help ease Greater Cairo's traffic congestion, but it also has tremendous potential as a tourist line connecting central Cairo to the pyramids and the Grand Egyptian Museum, which is currently under construction.MC has been delivering rolling stock to Egypt for more than 50 years, and to date has supplied the country with approximately 1,600 railway cars. Through sustained, proactive engagement in the country?s rail projects, MC remains committed to helping Egypt upgrade its transportation infrastructure and further its economic growth and development.About Mitsubishi CorporationMitsubishi Corporation, headquartered in Tokyo, is a global integrated business enterprise that develops and operates business across virtually every industry including industrial finance, energy, metals, machinery, chemicals, foods, and environmental business. Mitsubishi Corporation's current activities are expanding far beyond its traditional trading operations as its diverse business ranges from natural resources development to investment in retail business, infrastructure, financial products and manufacturing of industrial goods. For more information on Mitsubishi Corporation, please visit the company's website at https://www.mitsubishicorp.com/jp/en/.Contact:Mitsubishi Corporation Telephone:+81-3-3210-2171 Facsimile:+81-3-5252-7705 Copyright 2020 JCN Newswire. All rights reserved. www.jcnnewswire.com
TOKYO, Oct 31, 2020 - (JCN Newswire) - Hitachi, Ltd., Hitachi Rail STS S.p.A. (Hitachi Rail) and Mitsubishi Corporation (MC) have signed an approximately JPY 92.0 billion (USD 879 million) contract with HPH Consortium, the prime contractor for Panama Metro Line 3. Line 3 is a 25 km, elevated double-track monorail system, which will include 14 new stations.Image of a monorail system for Line 3 of Panama MetroHitachi and Hitachi Rail will provide 28 six-car vehicles (168 cars), the signaling systems, telecommunication systems, power systems, control center, platform screen doors and depot equipment for the monorail while MC will manage the administration of the project.When it opens in mid 2025, Line 3 of Panama Metro will transform the way people in Panama move, work and live. The monorail will move its passengers through the urban core and fast-growing west side of Panama City with ease before crossing the Panama Canal to tackle the route's many hills and steep grade. With breathtaking panoramic views, this line is expected to serve hundreds of thousands of passengers per year. Approximately 800 local jobs are expected to be created during the development of Line 3.As traffic congestion in big cities has become a universal problem, there is a growing demand for transportation systems with low environmental impact. Furthermore, urban population is expected to increase throughout the world, and the role of railways as a mode of public transportation is expected to increase. MC, Hitachi and Hitachi Rail will work to support sustainable urban development through its involvement in the railway business.It has been almost 10 years since MC learned the needs of monorail system in Panama and started promoting application of Japanese railway method. MC, Hitachi and Hitachi Rail, aim to contribute to the further development of Panama through this monorail project.About Hitachi, Ltd.Hitachi, Ltd. (TSE: 6501), headquartered in Tokyo, Japan, is focused on its Social Innovation Business that combines information technology (IT), operational technology (OT) and products. The company's consolidated revenues for fiscal year 2019 (ended March 31, 2020) totaled 8,767.2 billion yen ($80.4 billion), and it employed approximately 301,000 people worldwide. Hitachi drives digital innovation across five sectors - Mobility, Smart Life, Industry, Energy and IT - through Lumada, Hitachi's advanced digital solutions, services, and technologies for turning data into insights to drive digital innovation. Its purpose is to deliver solutions that increase social, environmental and economic value for its customers. For more information on Hitachi, please visit the company's website at https://www.hitachi.com.About Mitsubishi CorporationMitsubishi Corporation (TSE: 8058) is a global integrated business enterprise that develops and operates businesses together with its offices and subsidiaries in approximately 90 countries and regions worldwide, as well as a global network of around 1,700 group companies. MC has 10 Business Groups that operate across virtually every industry: Natural Gas, Industrial Materials, Petroleum & Chemicals, Mineral Resources, Industrial Infrastructure, Automotive & Mobility, Food Industry, Consumer Industry, Power Solution and Urban Development. Through these 10 Business Groups, MC's current activities have expanded far beyond its traditional trading operations to include project development, production and manufacturing operations, working in collaboration with our trusted partners around the globe. For more information on MC, please visit the company's website at https://www.mitsubishicorp.com/jp/en/. Copyright 2020 JCN Newswire. All rights reserved. www.jcnnewswire.com
TOKYO, Oct 31, 2020 - (JCN Newswire) - Hitachi, Ltd., Hitachi Rail STS S.p.A. (Hitachi Rail) and Mitsubishi Corporation (MC) have signed approximately JPY 92.0 billion contract with HPH Consortium, the prime contractor for Panama Metro Line 3. Line 3 is a 25 km, elevated double-track monorail system, which will include 14 new stations.Image of a monorail system for Line 3 of Panama MetroHitachi and Hitachi Rail will provide 28 six-car vehicles (168 cars), the signaling systems, telecommunication systems, power systems, control center, platform screen doors and depot equipment for the monorail while MC will manage the administration of the project.When it opens in mid 2025, Line 3 of Panama Metro will transform the way people in Panama move, work and live. The monorail will move its passengers through the urban core and fast-growing west side of Panama City with ease before crossing the Panama Canal to tackle the route's many hills and steep grade. With breathtaking panoramic views, this line is expected to serve hundreds of thousands of passengers per year. Approximately 800 local jobs are expected to be created during the development of Line 3.As traffic congestion in big cities has become a universal problem, there is a growing demand for transportation systems with low environmental impact. Furthermore, urban population is expected to increase throughout the world, and the role of railways as a mode of public transportation is expected to increase. MC, Hitachi and Hitachi Rail will work to support sustainable urban development through its involvement in the railway business.It has been almost 10 years since MC learned the needs of monorail system in Panama and started promoting application of Japanese railway method. MC, Hitachi and Hitachi Rail, aim to contribute to the further development of Panama through this monorail project.About Hitachi, Ltd.Hitachi, Ltd. (TSE: 6501), headquartered in Tokyo, Japan, is focused on its Social Innovation Business that combines information technology (IT), operational technology (OT) and products. The company's consolidated revenues for fiscal year 2019 (ended March 31, 2020) totaled 8,767.2 billion yen ($80.4 billion), and it employed approximately 301,000 people worldwide. Hitachi drives digital innovation across five sectors - Mobility, Smart Life, Industry, Energy and IT - through Lumada, Hitachi's advanced digital solutions, services, and technologies for turning data into insights to drive digital innovation. Its purpose is to deliver solutions that increase social, environmental and economic value for its customers. For more information on Hitachi, please visit the company's website at https://www.hitachi.com.About Mitsubishi CorporationMitsubishi Corporation is a global integrated business enterprise that develops and operates businesses together with its offices and subsidiaries in approximately 90 countries and regions worldwide, as well as a global network of around 1,700 group companies. MC has 10 Business Groups that operate across virtually every industry: Natural Gas, Industrial Materials, Petroleum & Chemicals, Mineral Resources, Industrial Infrastructure, Automotive & Mobility, Food Industry, Consumer Industry, Power Solution and Urban Development. Through these 10 Business Groups, MC's current activities have expanded far beyond its traditional trading operations to include project development, production and manufacturing operations, working in collaboration with our trusted partners around the globe. For more information on MC,please visit the company's website at https://www.mitsubishicorp.com/jp/en/ Copyright 2020 JCN Newswire. All rights reserved. www.jcnnewswire.com
SINGAPORE - A power fault shut down train service on parts of the North-South and East-West MRT Lines at around 7pm on Wednesday (Oct 14), severely disrupting the evening rush-hour commute for many commuters. At 7.30pm, the fault disrupted service along a 16-station stretch of the Circle Line. Preliminary investigations indicate that a faulty power cable had caused the breakdown, which is one of the most serious power-related incidents to hit the MRT network in recent years. Here are some other serious breakdowns: Dec 15 and 17, 2011 A sagging power-supply rail brings the North-South Line to a standstill on the evening of Dec 15, and then again on the morning of Dec 17, as SMRT fails to detect and rectify the damage completely. July 7, 2015 A power-supply trip causes both the North-South and East-West lines to fail, affecting about half a million commuters. The Land Transport Authority later blames a salt-caked insulator near Tanjong Pagar station, but is unable to replicate the fault. April 25, 2016 A power trip at one of the network's substations causes the western sector of the North-South and East-West lines, parts of the Circle Line, as well as the Bukit Panjang LRT system to fail. The trip is suspected to have been triggered by cable works on the East-West Line's Tuas West Extension. June 28, 2017 The entire North-South Line ceases to operate just after 5pm due to a fault on a newly-installed signalling system. The same fault also affected service on the East-West Line Tuas West Extension. About 10 minutes later, SMRT was able to get the train moving again but at lower speeds. SMRT and the Land Transport Authority (LTA) had said similar disruptions may persist for "a few more months". The pair attributed the latest twin faults to "a signalling fault on the new communication-based train control (CBTC) system". The entire North-South Line ceased to operate just after 5pm due to a fault on a newly-installed signalling system on June 28, 2017. PHOTO: ST FILE July 12, 2017 A power fault causes train services on the North-Line and East West line to fail late at night. In a tweet just after midnight on July 12, SMRT said that there were no train services between Jurong East and Kranji on the North-South Line, as well as between Tuas Link and Queenstown on the East-West Line. SMRT tweeted at 1.20am that train and bridging bus services have ended and that their engineers are still working to rectify the fault. More on this topic Related Story Train services return to normal following Wednesday's widespread disruption Related Story MRT power fault: I was stuck on train for 3 hours, says commuter Aug 17, 2017 A new signalling system fault near Ang Mo Kio causes two hour delays during peak hour on Thursday evening. Commuters were asked to disembark from at least one train at Toa Payoh station. A fault in a track point disrupted rush-hour services on the East-West Line on Sep 19, 2018. PHOTO: ST FILE Sept 19, 2018 A fault in a track point disrupted rush-hour services on the East-West Line on Sep 19, causing thousands of MRT commuters to face delays of up to 40 minutes during rush hour service. The glitch occurred between the Jurong East and Clementi MRT stations. Oct 9, 2019 The North-East Line (NEL) service was delayed by about 20 minutes at one point due to a signalling fault at Sengkang Station. SBS Transit tweeted at 7.50pm that the service on NEL was delayed and commuters could expect an additional travel time of about 10 minutes before introducing amending it several times. Commuters were stuck in trains for more than 15 minutes.














